How to Migrate a Monolith to Microservices While Continuing Feature Delivery

November 27, 2026

A monolith to microservices migration that pauses feature work will lose its funding before it finishes. Product teams can’t wait a year for new capabilities, and when leadership has to choose between the roadmap and the migration, the roadmap wins.

The way out is to make the migration part of the roadmap instead of a rival to it. The walk-through below follows one hypothetical system from the first decision to the last cleanup so the trade-offs show up in context. The company and its details are invented for illustration. They don’t describe a Carmatec client.

The example: an order system that every team has to touch

Picture a distributor with a ten-year-old order management application. It’s one codebase, one relational database and one deployment every two weeks. Billing, inventory, customer accounts, quoting and notifications all live inside it.

Releases are slow because every change needs a full regression pass. Last quarter a bug in the notification code slowed order entry for an afternoon, because both ran in the same process.

Leadership asks for microservices. The engineering leads ask a better question first: which parts of this system are costing us the most, and which of those can we separate safely?

Pick the first piece by independence, not by pain

The team lists every module and asks two things about each one. How often does it change, and how many other modules reach into its data?

Notifications changes almost weekly and touches few tables. Billing changes rarely but is tangled up with everything. Inventory is the module everyone worries about, and for good reason.

They start with notifications. It has low coupling, it removes a shared failure with order entry, and if the first attempt goes wrong the damage is a late email, not a wrong invoice. Starting with the most painful module is tempting. But a first extraction is where the team learns its tooling, its deployment pipeline and its monitoring, and that lesson costs less on a forgiving piece.

Put a routing layer in front before moving any code

The approach has a name. Martin Fowler describes the strangler fig application, which he named after vines he saw in Queensland rain forests in 2001: build new behavior beside the old system and move pieces across gradually. He says the alternative, a replacement that does “exactly the same” in better technology, has “gone down in flames most of the time.”

Microsoft’s Strangler Fig pattern guidance gives the mechanics. A facade (proxy) intercepts requests and routes them either to the legacy application or to the new services, and clients carry on using the same interface without knowing a migration is happening.

So our team puts a thin gateway in front of the monolith and, at first, passes everything straight through. Nothing changes for users. That’s deliberate. They can ship the gateway, watch it for a few weeks and learn how it fails before any real service depends on it.

The same guidance warns that the facade shouldn’t become a single point of failure or a performance bottleneck. In practice that means the gateway gets its own monitoring, its own alerts and more than one running instance from day one.

Shared data is where the schedule slips

The notification service needs customer contact details and order status, and both sit in the monolith’s database. If the new service reads those tables directly, the team has built a distributed monolith: two deployable units sharing one schema, so a column change in one still breaks the other.

Instead, the monolith publishes an event when an order ships, and the notification service consumes it. A small translation layer converts the legacy data shapes into the service’s own model. Microsoft recommends the Anti-corruption Layer pattern for calls between old and new systems, so the new design doesn’t inherit legacy quirks.

Plan the overlap period explicitly. During migration, both systems may need access to some of the same stores, and that has to be designed rather than discovered.

Cutover itself should be reversible for as long as possible. The team runs the old and new notification paths side by side, compares what each would have sent, then switches over a slice of traffic through the gateway. Microsoft’s data example makes the point about timing: rolling back is straightforward early on, but once legacy objects are removed it “significantly increases effort and risk.” The old code gets deleted only after a quiet period, as a separate, deliberate step.

Keep the roadmap moving on both sides of the seam

Halfway through, sales asks for a new quoting feature. The team needs a rule for where it goes.

If the area has already been extracted, the feature goes into the new service. If it hasn’t, it goes into the monolith, but behind a clear interface so the next extraction doesn’t have to untangle it. What the team avoids is building new features that reach deeper into the module scheduled to move next.

A feature freeze applies only to the module being cut over, and only for the days the cutover takes. Everything else keeps shipping.

The migration also needs protected capacity. Reserve a fixed share of each sprint for it, and agree that share with product before the work starts. The right proportion depends on team size and how much of the roadmap is deadline-driven, so there’s no universal number.

Ownership matters as much as code. Fowler notes that without organizational change, “the new systems will end up in a similar mess.” The notification service gets a named owning team that carries its pager and its backlog. A service nobody owns is just a smaller monolith.

What each cutover has to prove before the next one starts

The team sets a short exit check for every extraction, so the migration doesn’t drift into a permanent halfway state.

  • The gateway can route traffic to the new service and send it back with a configuration change, no redeploy.
  • Error rates and latency on the migrated path match or beat the baseline recorded before the change.
  • The service has its own deployment pipeline, dashboards and a named on-call owner.
  • No report, script or other service reads its data store directly.
  • The old code path has a removal date on the calendar.

Only then does inventory, billing or quoting get its turn. Each later extraction is faster, because the gateway, pipeline and event patterns already exist.

When this approach is the wrong tool

Microsoft’s guidance lists the cases where the pattern doesn’t fit: requests to the back end can’t be intercepted, you can’t change the legacy system at all, the system is small enough that replacing it whole is simple, or you need to switch the original off quickly.

There’s a fifth case worth checking before any of that. If the real complaint is slow releases, a modular monolith with clear internal boundaries and a faster automated test suite may deliver most of the benefit at a fraction of the operational cost. Microservices add network calls, distributed debugging and more things to monitor. Take on that cost only when independent deployment or scaling is a requirement you can name.

Getting a first extraction scoped

Choosing the first seam is an assessment task before it’s a coding task. Carmatec’s legacy application modernization services page lists system assessment and strategy, replatforming and architecture redesign (including moving from monolithic to microservices-based designs), code refactoring with API integration, and ongoing support. The page also says it uses phased migrations, parallel operations and thorough testing to limit disruption, which matches the approach described here.

Your first extraction will teach you more about your system than any target-state diagram. Choose one small enough to survive being wrong.